Tuesday, January 28, 2014

bathroom hall nearly done

look at those shiny chocolate brown doors!  after that coat dried... i repainted the door on the right.  never fear, it doesnt look that bad in real life.  remember how it took me 9 months to plaster and prime?  weeeell it only took another month to finally paint the walls and trim of the hallway outside my bathroom. 

 trim up close.  in case you were wondering.
and to show how far weve come in 10 months... a before and after.  in another month or so, my nailpolish rack will be rehung, the mirror from the back of the door will be hung on the wall opposite the bathroom door, and my crown moulding shoe rack will be reborn. 

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...